Backwoods 4wd Temp     |   home
DAY 1   |   Day 2   |   Day 3
Day 3

Final prep work before Jesse begins the welding process.  I got a little off task as I zapped a few rusted dents along side the bed.




Welding has begun.


Wow...who cut that floor?  Oh, that was me.  What can I say?

Just about finished for the day...After Jesse finished welding it up I took over with the grinder and knocked down the welds to make the two pieces of bed flush.

Whoa!!  That's a short-bed.

The rear has gained about 1.5"-2" of lift after the bob job.  The rear swing out tire carrier is next to be built and that should level out the ride.