Backwoods 4wd Temp | home
Day 3
Final prep work before Jesse begins the welding process. I got a little off task as I zapped a few rusted dents along side the bed.
Welding has begun.
Wow...who cut that floor? Oh, that was me. What can I say?
Just about finished for the day...After Jesse finished welding it up I took over with the grinder and knocked down the welds to make the two pieces of bed flush.
Whoa!! That's a short-bed.
The rear has gained about 1.5"-2" of lift after the bob job. The rear swing out tire carrier is next to be built and that should level out the ride.
|
||